The Bay gets a New Production Studio. See the Before, The During and The After. And then HEAR the Difference on The Bay!
On The Air!
Huber In The Morning
The Production Studio-Before
Ripping out the old carpet.
Starting on the ceiling.
Soundproofing
Lots of stuff
The panels arrive.
Purple Panels
More panels installed for soundproofing.
Panels
Hard at work.
The old door is coming off.
Outside Looking In
Bye Bye Door
Week 2 Construction Continues
Carpet Time!
Getting Connected
New ceiling and air
Painting Time
Walls and Ceiling
Big Guy
Table In!
Getting the room ready!
Hooking Things Up
Almost Done!
Looking Good!